Graph, folders and drafts.

The list and graph edit the same flow. A draft is not a saved, active flow.

1Steps

  1. Tap a node to edit and a connector to add a step; move steps within their scope.
  2. Review changes with undo/redo.
  3. Keep or discard the draft when leaving.
  4. Create a flow in a folder or move an existing flow from folder management.
  5. Choose Save to publish the edit.

2Limits

  • Tap a node to edit. Hold and drag to another step in the same branch. Pan the background or pinch to zoom.
  • Steps inside this block will also be removed. You can undo before saving.
  • Keep the draft and continue later. The saved flow stays unchanged.
  • Backups include saved flows. Unfinished drafts and pending credentials stay only on this device.
  • The selected version becomes a draft and the flow is disabled. Save to apply it. The last 20 versions are kept in the encrypted vault.

Next

Search the guide